FSM-300 the choice for Medical and Pathological Waste Management

Learn more about the features and benefits of our FSM-300 product.

Discover the FSM-300

Introducing the FSM-150, for medical and pathological waste management up to 4,800kg/day.

300 kg/hr Burn Rate

Fuelled by Diesel,LPG,Natural
Gas or Bio Fuel

Manual or Automatic Loading Available

Low Maintenance

Want to discuss one of our units?
Give Incinco a call...
+44 1438 821 000
Contact Us

Fill in the form below to speak with us today about the FSM300.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

The Incinco FSM-300 medical waste incinerator will safely, effectively  and efficiently dispose of your medical & hazardous waste by providing you with an onsite solution allowing you to maintain biosecurity on site.

A highly flexible solution the FSM-300 is a front-loaded incinerator with the option to have it fitted with an automatic loading system featuring our Ram Loader, Bin Tipper Systems and Gas Cleaning if required allowing you to meet any of the current emissions standards.

The FS range was developed to be deployed anywhere in the world, while maintaining reliability they can be found in some of the harshest and remote parts of the globe.

It is the preferred system for aid agencies, government institutes, clinics, health bodies, research facilities.

The FS300M is a compact machine capable of being fit in a 40ft Container while safely disposing of a wide range of medical and clinical waste including, Hospital,Pharmaceutical, Biological, Healthcare, Research and High Moisture* Wastes.

Making it a natural choice for international aid agencies, government bodies and departments, vaccination centres, research facilities, private clinics, hospitals and surgeries as well as other clinical and healthcare waste facilities.

An Efficient and Innovative Design for Optimal Performance

User-Friendly Interface for Easy Operation

The FSM-300 features advanced technology and a sleek design, ensuring efficient waste management.

High Capacity for Increased Productivity

With its robust construction and intelligent control system, the FSM-300 is built to handle up to 4,800kg/day of waste effectively.

Safe and Environmentally Friendly Operation

The FSM-300 is equipped with advanced safety features and emission control systems to ensure compliance with environmental standards.

Environmentally Friendly Incineration by Design

The FSM-300 Incinerator is a compact unit within our FS range, designed to burn/process waste at a rate of up to 300kg/hr The primary chamber allows for the loading of a mixture of waste types. Benefiting from two primary burners complete with an automatic combustion air system to ensure good combustion conditions within the primary combustion chamber.


The gases released from the waste in the combustion chamber then flow through into the secondary chamber this has two secondary / after burners and an additional combustion air system to maintain the chamber temperature of 850oC (1,050oC if Hazardous Waste) for a retention time of 2 Seconds.

Tri Layered Insulated Lining for Longjevity and Efficiency

The FSM-300 has a multi layered / tri layered approach to our refractory lining, consisting of two separate insulating layers, refractory concrete and high temperature alumnia bricks resulting in high thermal efficiency as well as delivering a reliable incineration cycle.

Automatic Loading Systems

There are multiple loading options available - as standard you can load manually through the front facing loading door which includes viewing ports to allow the operator to safely monitor the incineration cycles. This prevents overloading to ensure you have consistent results from each operation cycle.  

Additional loading systems are available with a fully automatic loading system featuring our Ram Loader and Bin Tipper Systems. The FSM-300 is accompanied by a fully automatic control system with HMI. The machine is completely automatic.

Containerised Incinerator Option

The FSM-300 has been designed with a modular approach with many configurations and can configured as a containerised unit for remote sites, such as camps, oil & gas sites, mine sites and disaster zones.

Design Principles

As with all Incinco incinerators the FSM-300 incorporates a primary chamber for incinerating waste, leading into a secondary chamber to process the gas with a 2 second retention enabling environmentally sustainable operation.

Gas Cleaning / Air Pollution Control

We also offer advanced filtration options including our ceramic filtration system. as well as wet gas scrubbers and Venturi systems.
The need for filtration systems will depend upon your waste stream and environmental permit.

All Incinco’s incinerators are designed and manufactured to meet and exceed current standards across the world with our latest machines beating the latest standards by up to 80% on specific emission limits.

Engineered,Designed & Built In the UK

All our machines are made and assembled in Great Britain, are CE certified and built to the highest standards in line with BS,EU and WHO guidelines.

If you have any further questions or your would like to visit our factory and view our incinerators yourself
call us on +44 (0) 1438 821000 or email sales@incinco.com

Discover the FS300-M Brochure

Learn more about the features and benefits of our FS300-M product.